Audits & Compliance
9 pieces, each argued from primary sources and each handing you something you can use on Monday.
- The Skeptic
A year of forklift checklists with no defects is not a clean fleet
Pull twelve months of pre-shift forklift checklists and compute defects reported per 1,000 exams and the share that ended in a tag-out. Then compare against maintenance work orders for the same trucks. If the work orders show faults the checklists never recorded, the daily examination is not happening.
- The Scout
The federal heat rule is still a proposal. Your strictest state rule is not.
List every site by state-plan jurisdiction, then test each site's heat plan against the strictest rule in your footprint. The number of sites that fall short is your budget gap, and it does not depend on what federal OSHA does next.
- The Floor Walker
Ten doors, before the first forklift goes in
Before a forklift enters any trailer, record at ten doors which securement is actually in place and whether the truck driver and the dock agree on its status. Any door where the status is verbal only is an unprotected door, whatever the audit says about chocks.
- The Skeptic
The Light Curtain Is Only as Safe as the Last Time Someone Timed the Press
Pull the last measured stopping time and the installed mounting distance for every press and guarded machine, then recompute the distance. If a press has no dated stop-time measurement, its safety distance is unverified, whatever the light curtain's certificate says.
- The Skeptic
The limit you measure against was set in 1968
Re-score your last 12 months of personal sampling against the NIOSH REL and Cal/OSHA columns of OSHA's own annotated tables. The count of results that flip from pass to fail is the size of the gap between your compliance record and your exposure control.
- The Skeptic
What the ISO 45001 certificate actually certifies
Sort every nonconformity from your last three-year certification cycle into paperwork versus field exposure. If the field pile is empty, the audit is grading your filing.
- The Floor Walker
The shop nobody audits
Bench grinder clearances are the only requirement on your site written in eighths of an inch. Measure every grinder in the maintenance shop: the count out of spec is a direct read on how much inspection attention the shop actually gets.
- The Skeptic
Your LOTO periodic inspection was a document review
Pull last year's lockout/tagout certifications. If you cannot tie each one to a named machine, a named authorized employee, and a date on which someone watched that employee isolate it, you ran a document review, not the periodic inspection 29 CFR 1910.147(c)(6) describes.
- The Skeptic
Your audit score measures the audit day, not the risk
A high third-party audit score certifies documentation and a well-run visit, not that a serious hazard is controlled on an ordinary unannounced day.